With
the manufacturing mill's mobility comes the flexibility of rolling
Bemo panels directly to the roof. This can be accomplished with either
our Bemo tilt-trailer or by hoisting the mill with a crane directly
to the roof's edge. Either method will save significant labor and
equipment dollars. Site forming also eliminates the need for leak-prone
end-laps conditions since the panels can easily be formed in continuous
lengths.


The power of these mills is evidenced
by their ability to push panels from the ground, directly to the
roof area. Handling, layout and dry-in times are all minimized.
Pre-Clipping Option

Save Crew Time - Dry in More Rapidly - Reduce Crew Costs
Aluminum Bemo Panel Projects allow the installer to use Bemo's exclusive
Halter Attachment System.
This state-of-art system provides the roofing contractor with the
flexibility to pre-clip the entire project before panels arrive or
are formed on the site.
Crew efficiency can be increased by over 30% on average when pre-clipping
is employed. By reducing the number of men required during the clip
installation process, crew down time is vertually eliminated.
|